Skip to content

Cost Guides

Kitchen Remodel Cost Orlando: 2026 Prices and Cost Drivers

Kitchen remodel cost in Orlando for 2026: refresh, mid-range and high-end ranges, what drives the price, and the hidden costs in Florida kitchens.

By the Prime Construction team Updated October 13, 2026 6 min read

Finished kitchen remodel with two-tone shaker cabinets, quartz counters and a subway tile backsplash

As of October 2026, a kitchen remodel in the Orlando area typically costs $15,000 to $35,000 for a cosmetic refresh, $35,000 to $75,000 for a mid-range full remodel, and $75,000 to $150,000 or more for high-end work or a layout change. These are installed planning ranges (labor and materials) for Orange, Seminole, Osceola and Lake counties. Where your project falls depends on cabinet grade, countertop material, whether plumbing or walls move, and what is found behind the old cabinets.

ScopeTypical Orlando range (2026)What it usually includes
Cosmetic refresh$15,000 to $35,000Same layout: paint, refinish or reface cabinets, new counters, backsplash, sink, faucet, lighting
Mid-range full remodel$35,000 to $75,000New stock or semi-custom cabinets, quartz or granite, tile backsplash, flooring, lighting, appliances, layout mostly unchanged
High-end or layout change$75,000 to $150,000+Custom cabinetry, moved plumbing or walls, premium appliances
Small kitchen (70 to 100 sq ft)$15,000 to $45,000Full remodel of a compact kitchen such as an 8x10

This page is our main Orlando kitchen cost guide. It explains the tiers, the factors that move a project up or down, and the costs homeowners do not see coming. If you want to know what a specific budget buys, see what $10,000, $30,000 or $50,000 gets you. For a line-by-line split, see the kitchen remodel cost breakdown.

The three kitchen remodel tiers in Orlando

Cosmetic refresh: $15,000 to $35,000

A refresh keeps the cabinet boxes, the layout and the plumbing where they are. The money goes into what you see and touch every day:

  • Cabinets painted, refinished, or refaced with new doors and drawer fronts
  • New countertops, often quartz or granite
  • A new tile backsplash
  • New sink, faucet and lighting

This tier works well when the cabinet boxes are solid and the layout already suits you. Cabinet refacing alone for an average kitchen typically runs $7,000 to $15,000, which is why it shows up in most refresh budgets. On-site work usually takes 1 to 3 weeks.

Mid-range full remodel: $35,000 to $75,000

This is the tier most Orlando homeowners mean when they say “remodel the kitchen.” Everything comes out down to the walls and subfloor, but the sink, range and refrigerator stay roughly where they are. Typical scope:

  • New stock or semi-custom cabinets
  • Quartz or granite countertops
  • Tile backsplash
  • New flooring and lighting
  • A new appliance package

Staying close to the existing layout is what keeps this tier from climbing into the next one. Plan on 4 to 8 weeks on site.

High-end or layout change: $75,000 to $150,000+

Projects move into this range when the plan changes, the materials go custom, or both:

  • Custom cabinetry built to the room
  • Moving the sink, range or gas line
  • Removing or opening walls, especially load-bearing ones
  • Premium appliance packages, which alone can run $15,000 or more

Many projects in this tier are kitchens being opened to a family room, or kitchens in larger homes where the cabinet run and the island are simply bigger.

What drives kitchen remodel cost in Orlando

Cabinets

Cabinets are usually the largest line, roughly 30 to 40 percent of a full kitchen budget. The grade (stock, semi-custom or custom), the box material, the door style and the number of drawers and pull-outs all add up. Refacing is the main way to cut this line: it usually costs 40 to 50 percent less than comparable new cabinets. Our cabinet refacing page explains when the boxes are worth keeping.

Countertops

Installed countertop prices run from about $25 per square foot for laminate to $200 or more for marble and quartzite. A typical 40 to 60 square foot kitchen in quartz comes to about $3,000 to $7,000. Islands, waterfall ends and full-height backsplashes in the same stone add square footage fast.

Appliances

An entry appliance package runs about $3,000 to $6,000, mid-range $6,000 to $15,000, and premium $15,000 and up. Because this line can swing by $10,000 or more on its own, decide on the appliance level early. Cabinet openings are built around the appliance sizes you choose.

Layout changes

Moving a sink or other plumbing typically costs $1,500 to $4,000 or more. Most Central Florida homes are slab-on-grade, so moving a drain means cutting and trenching the concrete floor, then patching it. Removing a non-load-bearing wall runs $1,000 to $3,000 plus patching, while a load-bearing wall with a beam and engineering runs $5,000 to $15,000 or more.

Size

A bigger kitchen means more cabinet boxes, more countertop square footage, more flooring and more lighting. Our cost by size and material guide shows how footprint and finish choices interact.

Backsplash

Backsplash tile installed runs $20 to $60 per square foot. Ceramic and subway tile sit at the low end; glass, mosaic and natural stone at the high end. Most Orlando kitchens spend $1,000 to $3,000 total.

Hidden costs in Orlando kitchens

Most budget surprises come from what is behind the old cabinets and under the old floor. These are the ones we see most in Central Florida homes:

  • Old plumbing. Many older Orlando-area homes still have galvanized steel or polybutylene supply lines. Once the walls are open, replacing them is often the smart call, and it was not in the original price.
  • Water damage. A slow leak under a sink or behind a dishwasher can rot the subfloor or cabinet base and leave mold on the drywall. It has to be fixed before new cabinets go in.
  • Electrical upgrades. Current electrical code calls for GFCI protection on countertop outlets and dedicated circuits for several appliances. Older kitchens often need new circuits, and sometimes the panel has no room for them.
  • Ventilation. Venting a range hood to the outside is worth it in Florida humidity, but running a new duct through a wall or roof adds labor and may need a permit.
  • Slab work. Any drain move on a slab means concrete cutting. Even a small shift of the sink can add to the cost.
  • Permits. Fees are set by each city or county fee schedule, usually based on the job’s value. A licensed contractor includes them in the estimate.

A good estimate names these risks up front and explains how they would be priced if found. Keep some room in your budget rather than spending the full amount on finishes.

How long each tier takes

ScopeDesign, selections, orderingOn-site work
Cosmetic refresh3 to 8 weeks1 to 3 weeks
Small kitchen full remodel3 to 8 weeks3 to 6 weeks
Full remodel3 to 8 weeks4 to 8 weeks

Cabinet lead times drive the front end, and custom cabinets take longer. Permit review adds time and varies by jurisdiction. Our Orlando kitchen remodeling page walks through how we schedule each phase.

How to set your number

  1. Pick the tier first. Decide whether you are refreshing, replacing in the same layout, or changing the layout. That single decision sets most of the range.
  2. Choose the appliance level. Entry, mid-range or premium can move the budget by thousands.
  3. Decide on cabinets. Reface, stock, semi-custom or custom.
  4. Get a measured estimate. Online calculators cannot see your slab, your plumbing or your walls. A written estimate after an in-home measure can.

If the number is tight, the biggest savings come from keeping the layout, refacing instead of replacing cabinets, and choosing a mid-range appliance package.

Planning a kitchen remodel in Orlando?

Prime Construction is a licensed general contractor serving Orlando and nearby cities in Orange, Seminole, Osceola and Lake counties. We measure your kitchen, prepare a 3D design rendering and give you a written estimate before anything is ordered. Call (407) 404-3944 or request an estimate.

FAQ

Common questions

Do not see your question? Call us or send the estimate form and we will answer it on the phone.

What is the average cost to remodel a kitchen in Orlando, Florida?

Most full kitchen remodels in the Orlando area land between $35,000 and $75,000 in 2026, with new cabinets, quartz or granite, tile backsplash, flooring, lighting and appliances in the same layout. A cosmetic refresh runs $15,000 to $35,000, and high-end or layout-change projects run $75,000 to $150,000 or more. A written estimate after measuring is the only real number for your kitchen.

What is the most expensive part of a kitchen remodel?

Cabinets are usually the largest single line, roughly 30 to 40 percent of a full kitchen budget. After that, appliances and countertops are the next big items, and moving plumbing or walls can rival them when the layout changes.

How much does it cost to remodel a kitchen in Florida in 2026?

In Central Florida, typical 2026 planning ranges are $15,000 to $35,000 for a cosmetic refresh, $35,000 to $75,000 for a mid-range full remodel, and $75,000 to $150,000 or more for high-end work or a new layout. Coastal markets and luxury homes can run higher, and slab foundations make plumbing moves cost more than in homes with crawl spaces.

Does a kitchen remodel in Orlando need a permit?

It does when the work changes plumbing, electrical, gas, ventilation, walls or the layout. Swapping cabinets in the same spot, replacing countertops, new flooring and paint usually do not, but confirm with your city or county building department. Permit fees are set by each jurisdiction's fee schedule and are included in a contractor's estimate.

How long does a kitchen remodel take in Orlando?

Plan on 3 to 8 weeks for design, selections and ordering, then 4 to 8 weeks of on-site work for a full remodel. A cosmetic refresh takes 1 to 3 weeks on site, and permit review adds time that varies by jurisdiction.

Services

Ready to talk to a contractor?

Guides

Keep reading

All guides

Estimates

Get an in-home estimate

Tell us about the project. We call back within 24 to 48 hours to set up the in-home measure, and you get a written estimate after the visit.

  • In-home measure and 3D design before you commit
  • Licensed general contractor and plumbing contractor
  • Permits pulled and inspections handled by us
(407) 404-3944 Mon to Fri, 9 AM to 5 PM

Get your estimate

Takes 30 seconds. We call you back within 24 to 48 hours.

Add details (optional)

Required. By sending this form you agree that Prime Construction may call, text or email you about your project. Message and data rates may apply. Privacy policy.

Call now Get an estimate